A good water damage restoration estimate lists the rooms, the work in each room, the equipment and how long it will run, how dryness will be measured and what is excluded. It separates drying from rebuild, states what changes the price and gives you terms in writing. If an estimate is a single number with no detail, ask for the breakdown before you sign.
This checklist works for any company, and it helps you compare bids on the same footing. It is general guidance, not a pricing guide, since a fair number needs a real look at the loss.
Section 1: The basics
Check that the estimate names you, the address, the date and the cause of loss as you described it. It should state the water category, such as clean, gray or contaminated, and the reason. It should list the areas affected and note any hidden areas, such as wall cavities or the floor below, that still need checking.
If the estimate was written without a visit, it is a guess. Ask when the crew will confirm it with readings.
Section 2: Scope, by room
The scope is the heart of the estimate. It should list each room and each material, with the work to be done: extract, remove, clean, dry or replace. Heights matter for walls, since removing drywall to two feet is different from removing it to four.
| Line item | What to look for | Red flag |
|---|---|---|
| Extraction | Method and area | No mention of how water is removed |
| Demolition | Materials and heights | "As needed" with no detail |
| Equipment | Type, count, days | A flat fee with no equipment named |
| Monitoring | Daily readings, reference | No mention of measuring |
| Cleaning | Surfaces and product class | "Sanitize" with no detail |
| Disposal | Included or extra | Silent on disposal |
| Rebuild | Included or excluded | Mixed in without a split |
Holding an estimate you cannot read?
Describe your loss and ask for the scope split by room and stage so you can compare.
Section 3: Equipment and monitoring
Ask how many air movers and dehumidifiers will run and for how many days. Those numbers drive the price, and they should match the size of the wet area. Ask how readings will be taken, how often and how you will see them.
The structural drying page explains what the equipment does, and the water extraction page covers the first stage. An estimate that does not mention monitoring is incomplete.
Section 4: What changes the price
A fair estimate explains what could change the number. Common factors are the size of the wet area, the water category, the time since the loss, hidden water behind walls, the number of days equipment runs and the rebuild scope. Ask what happens if the scope grows, and get the answer in writing.
Be careful with a quote that promises a fixed number of drying days before anyone has taken readings. Materials dry at different speeds, and a promise made in advance may be a way to sell equipment time.
- Payment schedule and deposit
- How changes to the scope are approved
- Who disposes of materials and where
- Warranty or workmanship terms, if any
- Whether photos and logs are included at the end
Section 5: Insurance handling
Ask whether the company will share photos, readings and the scope with your insurer. Ask who is billed and what happens if the insurer pays less than the estimate. Remember that your insurer decides coverage, and the estimate does not guarantee payment.
For the coverage side, check your policy and ask your agent. Some insurers use their own pricing guides, and a difference between the guide and a company's estimate is common. Ask both parties to explain it.
Section 6: Safety and contamination
If the water is contaminated, the estimate should say how the area will be contained and how waste will be handled. The sewage backup cleanup page describes what a Category 3 job needs. A bid that treats sewage like clean water is understating the work.
Section 7: Timeline
Ask when work starts, how many days of drying are expected and what ends the job. A timeline based on readings is better than a timeline based on a calendar. Ask what happens if the schedule changes, and who will contact you.
Estimates should use the vocabulary of the ANSI/IICRC S500 standard, such as water category and dry standard.
Local points for Wyandotte estimates
Ask whether the estimate accounts for local requirements. Wyandotte's Engineering and Building Department handles permits, and the city's electrical code adopts the 2023 National Electrical Code, so wiring replaced after a loss may need inspection. If the work includes plumbing or structural repair, confirm who pulls the permit and whether that cost is in the estimate.
Storm seasons matter too. After the August 2014 event, FEMA declared disaster DR-4195 in Wayne County, and demand for crews and materials rose sharply. Ask how the company handles busy periods and whether the estimate holds if materials cost more.
If you are comparing companies that serve Ecorse or Riverview, the same checklist applies, with different city offices for permits.
Section 8: Contents and personal property
Many estimates leave out contents, such as furniture, boxes and electronics. Ask whether the crew moves contents, stores them or cleans them, and what the cost is. Ask who is responsible if an item is damaged during the move. Make a list of valuable items before the crew arrives, and photograph them.
Section 9: Cleanup and disposal
Ask who removes debris and where it goes. Bagged waste from a contaminated area needs proper handling, and hauling can be a surprising cost. Ask whether the price includes a dumpster, and whether the crew will leave the work area broom clean.
How to compare two estimates
Lay them side by side. For each room, compare the work. For each piece of equipment, compare the count and days. For each exclusion, ask whether you would need it. Then compare the total. The lower number is not better if it leaves out work you will need to buy anyway.
Before you sign
Read every page, ask about anything you do not understand and keep a copy. If a company will not put its scope in writing, that is the answer. Do not sign a blank or incomplete form, and do not let anyone rush you.
Estimate questions
It can give a range, but a real number needs a look and readings. Treat a phone number as a guess.
Usually scope. One may include demolition, monitoring or rebuild that the other leaves out.
Some crews ask for one. Ask what it covers and what happens if the scope changes.
Ask who will contact the Engineering and Building Department and whether permit costs are in the estimate.